Disclaimer | Impressum | Sitemap | Data protection

CLIPPER HEBE

9 Oct 2007

In August 2007 the 17,000 cbm LEG/LPG carrier “CLIPPER HEBE” has been completed at the German MEYER YARD. The ship is the first of a series of four gas carriers for the Norwegian Shipowner Solvang ASA.

The length over all of this ship is 154.9m, the beam 22.7m. The speed is 17.7 kn. The draught for Ethylene loading is 8.1 m and for VCM loading 10.6 m.

During gas trial at Rafnes in Norway the gas plant has been tested successfully with Ethylene cargo under supervision of TGE engineers and has proven its excellent performance.

The TGE scope comprises detail engineering, the design of the cargo handling system and of cargo deck tanks and the delivery of the gas handling equipment. Furthermore the construction, pre-commissioning, commissioning and performance tests where supervised by TGE.

The cargo tanks and other components for this ship have been supplied by Neptun Yard at Rostock / Warnemünde, a sister company of Meyer Yard at Papenburg.

Back

The Motorship 2018 Propulsion & Future Fuels Conference

31 Oct 2018
The Motorship 2018 Propulsion & Future Fuels Conference
14th of November – 17th of November 2018 in Hamburg, Germany […] more

Mariko Workshop "Alternative Kraftstoffe II"

31 Oct 2018
Mariko Workshop
07th of November 2018 in Leer, Germany
08th of November 2018 in Hamburg, Germany […] more

Contract signed for one of the world’s first small scale LNG- FRU

17 Sep 2018
Contract signed for one of the world’s first small scale LNG- FRU 17 Sept 2018 […] more

Disclaimer | Impressum | Sitemap | Data protection
TGE Marine Gas Engineering GmbH | Mildred-Scheel-Strasse 1 | 53175 Bonn | GERMANY | Phone: +49 228 50218 0 | Fax: +49 228 50218 880