Coral Methane
7,500 cbm LNG/LPG/Ethylene-Carrier / Bunker Vessel
for ANTHONY VEDER, The Netherlands
7,500 cbm LNG/LPG/Ethylene-Carrier / Bunker Vessel
for ANTHONY VEDER, The Netherlands
Project Data: | 2021 |
---|---|
Owner: | ANTHONY VEDER, The Netherlands |
Shipyard: | Remontowa, Gdansk, Poland |
Year of Completion: | 2009 / Conversion 2018 |
Classification: | BV |
TGE's Scope: | EPCS-contract, gas handling system, fuel supply system, complete cargo tanks, ship design development |
7,500 cbm LNG/LPG/Ethylene-Carrier / Bunker Vessel | |
---|---|
Length o.a. | 117.8 m |
Beam: | 18.6 m |
Draught (LNG): | 6.8 m |
Speed: | 15.5 kn |
Characteristics of gas plant: | |
---|---|
Capacity: | 7,500 m³ |
Number of cargo tanks: | 2 |
Material of cargo tanks: | AISI 304L |
Cargoes: | LNG/LPG/Ethylene/Ammonia/VCM |
Design temperature / pressure: | -163°C / 3.2 bar g acc. to IMO at sea |
Maximum cargo density: | 650 kg/m³ |
Number of segregations: | 2 |
Cargo manifolds: | 3 liquid lines, 2 x 8”, 1 x 6” ANSI 300 lbs flanges 3 vapour lines, 2 x 6”, 1 x 4” ANSI 300 lbs flanges |
Loading- / Unloadingrate: | 900 m³/h (with vapour return) |
Deepwell pump | 2 x 450 m³/h at 120 m LC for LEG/LPG 2 x 450 m³/h at 210 m LC for LNG |
Booster pump | 1 x 450 m³/h at 120 m LC |
Number of cargo heater / vaporiser: | |
1 indirect ethylene vaporiser | Capacity: 900 m³/h at 15°C sea water temp. |
1 direct sea water heated LPG-heater / va-poriser | Capacity: 174 t/h Propane from -42°C to 0°C at 15°C sea water, vapour 3 t/h |
1 indirect LNG vaporiser | Capacity: vapour 1 t/h |
Reliquefaction system: | Cascade / direct cycle (not including LNG) 2 x refrigerant compressors (refrigerant R404A) 2 x cargo compressors |
Cargo piping system: | Stainless steel |
Nitrogen generation plant: | |
Pressure swing adsorption | Capacity: 750 Nm³/h at 0.5 vol. % O2 |
Deck Tank: | Capacity: 1 x 80 m3 |
Design Pressure / Temperature: | 18 bar g/ -163°C |