Wideshine Enterprises: Hong Li
9,500 cbm CHS and FGS Carrier
for Wideshine Enterprises Ltd.hina
9,500 cbm CHS and FGS Carrier
for Wideshine Enterprises Ltd.hina
Project Data: | 3711 A, B |
---|---|
Shipyard: | Guangzhou Wenchong Shipyard Co. Ltd., China |
Year of Completion: | 2022/2023 |
Classification: | CCS |
TGE's Scope: | Complete gas handling and fuel supply system |
Characteristics of gas plant: | |
---|---|
Capacity: | 9,500 m³ |
Number of cargo tanks: | 2 x cylinder |
Material of cargo tanks: | 9% Ni steel |
Cargoes: | LNG |
Design temperature / pressure: | -163 °C |
Maximum cargo density: | 972kg/m³ |
Number of segregations: | 2 |
Elevated manifolds: | Two liquid line 1 x 10”, Branch 2 x 16” ANSI 300 lbs flange Two vapour line 1 x 6”, ANSI 300 lbs flange |
Loading- / Unloadingrate: | Xx m³/h |
Deepwell pump | 2 x 450 m³/h at 120 m l.c. |
Booster pump | 450 m³/h at 120 m l c |
BOG-handling & fuel gas system: | 2 x cargo compressors with intercoolers 1 x aftercoolers 2 x submerged fuel gas pumps 2 x fuel gas buffer tank |
Cargo piping system: | Stainless steel, AISI 316L |
Inertgas plant: | |
PSA type | Capacity: 1,000 Nm³at 99.5 vol. % N2 |